Ocallaghan Concrete

Concrete specialist · Sydney and rural NSW

Slabs.
Driveways.
Footings.
& more.

For all your concrete needs and wants. Formed, steel fixed and poured by the same crew, so the job is done right from the first peg to the final finish.

Freshly finished double driveway on a new build

Recent job

Double driveway, new build

01Slabs02Driveways03Footings04Steel fixing05Formwork

Services

One crew, start to finish

Formwork, steel and concrete under one roof. No waiting on another trade to turn up before the pour.

01

House slabs

Waffle pod and raft slabs set out, formed, reinforced and poured to the engineer's plans.

  • Waffle pod
  • Raft and stepped slabs
  • Garage and shed slabs

02

Driveways

Mesh on chairs, crisp edges and a finish that suits the house. Plain, broom or coloured.

  • New builds
  • Remove and replace
  • Crossovers

03

Footings

Strip and pad footings dug, tied and poured to depth, ready for the next trade.

  • Strip footings
  • Pad and pier
  • Retaining wall footings

04

Steel fixing

Reo, mesh and trench bars tied to spec and ready for inspection, first time.

  • Mesh and bar
  • Trench mesh
  • Inspection ready

05

Formwork

Straight, braced forms that hold their line through the pour and strip clean.

  • Edge forms
  • Step-downs
  • Suspended edges

06

Paths and patios

Side paths, alfresco areas and pool surrounds that drain the right way.

  • Side paths
  • Alfresco
  • Pool surrounds

Our work

Recent pours

Real jobs, filmed and photographed on site. From mesh on chairs to the finished surface.

See all work

Slab · Reel

Slab build, set out to pour

Outdoor · Reel

Curved fire pit seating

Driveway mesh on chairs

Driveway · Steel fixed

Driveway mesh on chairs

How we work

Set out. Form. Fix. Pour.

Four steps, done in order, done properly. You know where the job is at every stage.

1

Set out

We measure, check levels and confirm the plans before a single peg goes in.

2

Form

Formwork goes up square and braced, with step-downs and edges where they belong.

3

Fix

Steel is tied on chairs to spec so the engineer signs it off on the first visit.

4

Pour

Poured, screeded and finished on the day, then cured and stripped clean.

Got a job coming up?

Send through the plans or a few photos of the site and we will come back with a clear, itemised quote.